The recent quarterly from SBM contains some results. Nothing that exciting so far but they are starting a second round of drilling so still in play.
Lake Wells Gold Project, Yilgarn WA
A 585 hole (LWAC0001 to LWAC0585) aircore drill program for 29,337 metres testing 8 targets was completed in Q4 June FY19 with final assay results returned in Q1 September FY20 (Figures 5.0 to 5.1 and Table 7). A detailed ground gravity survey was completed in July 2019 covering an approximate 1,273 square kilometre area with 4,040 stations collected on an 800 metre by 400 metre spacing.
A targeting study was completed over the entire tenement package using historical data, a recent detailed airborne magnetic survey and results of the first aircore drill program.
A second round of aircore drilling, comprising 230 holes for 13,500 metres testing seven targets is expected to commence in October 2019 (Figures 5.0 to 5.1)
- Forums
- ASX - By Stock
- APC
- Ann: September Quarterly Activities Report
Ann: September Quarterly Activities Report, page-16
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add APC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.070M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $2 | 1.58K |
Featured News
APC (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online