"The well was shut-in, a few feet below the top of the Miogyp, to allow the removal of oil contaminated mud prior to continued drilling. This operation is being completed at the present time. It is expected to take approximately 18 hours to reach total depth once drilling resumes. Formation evaluation logs will be run at that time after which production casing will be installed"
Has drilling resumed or are they still removing oil contaminated mud?
GGP Price at posting:
0.0¢ Sentiment: Hold Disclosure: Held