A3D 5.00% 6.3¢ aurora labs limited

Ann: Change to Remuneration Package of Managing Director, page-78

  1. 36 Posts.
    lightbulb Created with Sketch. 33
    Yes I understand the way MCP works,
    But the physics and the calculation remains the same, to output 350kg per day you need at least 18 lasers working simultaneously, no matter if they are all working on different layers (as aurora) or all working on the same layer at a time (as EOS/SLM and others).

    Lets say you have two machines with 4 lasers :
    - One with 4 lasers working simultaneously on the same layer (as renishaw/EOS M400/SLM500)
    - One with 4 lasers each working on a different layer at the same time (as aurora)

    Except recoating time differences, the two machine will take the same time to complete 4 layers.

    But I agree that the recoating process is faster with this solution but the recoating process usually corresponds to 10 to 30% of the total build job. So it cannot explain the total increase in printing speed.

    So either they are using an incredible amount of laser, either they use really high power laser at the expense of resolution or material quality (but I'm not convinced the it is enough to acheive this productivity anyway).

 
watchlist Created with Sketch. Add A3D (ASX) to my watchlist
(20min delay)
Last
6.3¢
Change
0.003(5.00%)
Mkt cap ! $22.85M
Open High Low Value Volume
6.0¢ 6.3¢ 6.0¢ $40.38K 670.1K

Buyers (Bids)

No. Vol. Price($)
1 46388 6.1¢
 

Sellers (Offers)

Price($) Vol. No.
6.3¢ 109998 2
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
A3D (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.