MTC metalstech limited

Ann: MetalsTech Acquires Advanced Sturec Gold Project, page-493

  1. 5,505 Posts.
    lightbulb Created with Sketch. 300
    Sturec will be an open pit operation utilising conventional mining methods. Low grade ore will be mined and stockpiled for treatment in the latter years of the mine life. The process plant will comprise conventional gravity and CIL cyanidation circuits with a 6kt/d design capacity.Gold production is estimated at around 65 thousand ounces per annum. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

    THe above text is the summary of an expensive report which can be found here: https://www.woodmac.com/reports/metals-kremnica-sturec-gold-mine-project-16309656 It seems like there isn’t a plant because they say the plant “will be...”, there isn’t any mention of plant on the Arc Minerals site or Annual Report either.

    @vincerli it says it will be open pit here


 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
13.5¢
Change
0.005(3.85%)
Mkt cap ! $28.17M
Open High Low Value Volume
13.5¢ 13.5¢ 13.5¢ $3.713K 27.5K

Buyers (Bids)

No. Vol. Price($)
2 67188 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
13.5¢ 1000 1
View Market Depth
Last trade - 14.10pm 27/06/2025 (20 minute delay) ?
MTC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.