This stock does deserve to be punished hard for that announcement. In my opinion it is misleading. To wipe away the jorc requirement to provide drill assay results in context (plan and section view) by just saying not yet available is embarrassing at best.
They had all the drill data, logs, historical drilling (odd that the historical drilling doesnt appear on the half baked plan in figure 1, again where is the context).
In my opinion once assays recieved it should take no longer than a few hours to produce a cross-section, they were in a TH, and it is a jorc requirement. DYOR.
- Forums
- ASX - By Stock
- GCM
- Ann: Bonanza 22% Copper, 1.1oz Palladium and High-Grade Nickel
Ann: Bonanza 22% Copper, 1.1oz Palladium and High-Grade Nickel, page-43
-
- There are more pages in this discussion • 65 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
-0.001(16.7%) |
Mkt cap ! $3.671M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $5 | 1.999K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 17734747 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 13208644 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 17734747 | 0.002 |
27 | 34191613 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 13208644 | 3 |
0.004 | 21402758 | 13 |
0.005 | 4297981 | 6 |
0.006 | 853499 | 8 |
0.007 | 273098 | 2 |
Last trade - 10.50am 18/10/2024 (20 minute delay) ? |
Featured News
GCM (ASX) Chart |