ETM 4.17% 2.5¢ energy transition minerals ltd

Euroz coverage on GGG, page-17

  1. 1,572 Posts.
    lightbulb Created with Sketch. 343
    Should have said "having adjusted the production start and buildup, dropping the uranium price to $25 further reduces the NPV from $1.4B to $1.2B. If the operating cost is then set to $4/kg, the NPV rises to $1.6B."


 
watchlist Created with Sketch. Add ETM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.