PET 0.00% 2.5¢ phoslock environmental technologies limited

Ann: Lake Dianchi & Catchment - New Project Area, page-15

  1. 122 Posts.
    lightbulb Created with Sketch. 32
    So the guaranteed application area is the reservoir with 3.94 million cubic metres capacity. Typical application rate for Phoslock is 150 mg/l. That equates to 591 t x $3000/t = $1.7 million. Maybe add the same amount for engineering work.

    The story here is the potential to win the contract for the entire catchment, and that's a hell of a story if it comes off, but the guaranteed income is modest at this stage.

 
watchlist Created with Sketch. Add PET (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.