Last quarter, the average gas production was 7.2 TJ/day. The plan was to produce 20TJ/day. They are not doing a great job on the production side.
Myall Creek 4 flows at 0.6 to 0.8 million cubic feet per day (last financial report) which is around 0.7 TJ/day. If the other three drilled wells are like this, then, there is not much scope to increase production. The company was targeting 20TJ for 2019, then for 2020, and according to the latest presentation 'as soon as possible'!
- Forums
- ASX - By Stock
- AJQ
- Ann: Operational Update
Ann: Operational Update, page-55
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AJQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.31M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AJQ (ASX) Chart |
Day chart unavailable