It was already the most capital intensive project (from memory). A blow out would be a concern for the whole sector unless it is shown that it is a cost very specific to KLL.
The SO4 Lake Wells scoping study compared to the Lake Way DFS was a massive blowout. All these projects are much more expensive than anyone originally thought.
Back in the RWD glory days, a Shaw Stockbroking research note estimated the LD capital cost to be $150M.
But KLL look to have been very methodical, it would be very surprising to see a major cost blowout.
- Forums
- ASX - By Stock
- KLL
- Ann: Suspension from Official Quotation
Ann: Suspension from Official Quotation, page-35
-
- There are more pages in this discussion • 71 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable