Say silver goes to $50/oz and MMN get there act together and start producing at an economical rate and SP of MMN goes to $1 some time before expiry.
MMN Cost 4c. SP = $1. Profit = 25 bagger. IE $1000 = $25,000
MMNOB Cost 2c. SP = 92c. Profit = 46 bagger. IE $1000 = S46,000.
BTW if you think that those figures are absurd, MMNOB example I gave here is exactly the price I paid and received with some AYO ops (now AZZ) about 9 years ago although ex price was 35c and AYO was trading about 16c with shorter expiry.
Long time between drinks, hey
- Forums
- ASX - By Stock
- MMN
- why are mmnob 2c with mmn at 4c
MMN
macmin silver ltd
why are mmnob 2c with mmn at 4c, page-4
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)