It seems there are ads for Namibians to crew a rig very soon and there are no other rigs currently bound for Namibia apart from the Voyager, so I am convinced Venus will be end of April
Here is a licence map for Angola and shows blocks 32 & 48 adjacent to each other. It is possible both Angola wells are drilled from the same location
Angola licence map
http://www.sonangol.co.ao/English/AreasOfActivity/Concessionary/Documents/GAD201901-DMC0001-I.pdf
Example
https://www.worldoil.com/news/2017/11/16/rosneft-drills-worlds-longest-well-in-sakhalin
By the month end the Voyager will have been drilling for around 84 days of a 3 well 240 day contract approximately, which includes a two well option
The rig is to return to Angola for the two option wells. As I said before 240 days is an average of 48 days per well, if the options are included and looking at the Maersk link they ARE "The contracts include two additional one-well options."
https://www.maerskdrilling.com/news-and-media/press-releases/maersk-drilling-selected-by-total-to-drill-at-world-record-water-depth-in-angola-namibia-campaign
- Forums
- ASX - By Stock
- PCL
- Ann: Pancontinental's Response to COVID-19
Ann: Pancontinental's Response to COVID-19, page-13
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PCL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $121.9M |
Open | High | Low | Value | Volume |
1.5¢ | 1.5¢ | 1.5¢ | $19.70K | 1.313M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 10129651 | 1.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 1000045 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 10129651 | 0.014 |
10 | 3015668 | 0.013 |
11 | 8536666 | 0.012 |
7 | 3168181 | 0.011 |
4 | 2250000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 1000045 | 2 |
0.016 | 6860963 | 11 |
0.017 | 4477318 | 8 |
0.018 | 9068408 | 7 |
0.019 | 4745964 | 8 |
Last trade - 15.59pm 15/10/2024 (20 minute delay) ? |
Featured News
PCL (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online