AVZ Delivers Highly Positive Definitive Feasibility Study for
Manono Lithium and Tin Project
US$2,348 M1
pre-tax NPV10 and US$1,028 M1
post-tax NPV10
Internal Rate of Return of 53% (pre-tax)1
and 33% (post-tax)1
Net Profit After Tax - Life of Mine of US$3,779 M1
Payback period of 1.50 years (pre-tax) and 2.25 years (post-tax)
The Ore Reserves contains 44.6 Mt of Proved Category and 48.5 Mt of
Probable category Ore Reserves
Life of Mine beyond 20 years based on a 4.5 Mt/a operation under
pinned by the Ore Reserves
Conventional open pit mining with low ore waste strip ratio of 1:0.48
LOM lithia recoveries of 60% using only conventional DMS
CAPEX of US$545.5 M includes a contingency of US$49.59 M (10%)
US$380 M average annual EBITDA for LOM
Two transport routes solution at US$229 per tonne2
cost to Lobito port
and US$275 per tonne2
cost to Dar es Salaam port
20-year mine life producing 700,000 tonnes per annum high grade of SC6
lithium3
and 45,375 tonnes per annum of Primary Lithium Sulphate
Pre-production capital expenditure of US$545.5 M includes transport
upgrade and rehabilitation of the Mpiana Mwanga Hydroelectric Power
Plant
Initial project development works already
- Forums
- ASX - Day Trading
- Morning trading April 21
Morning trading April 21, page-6
-
- There are more pages in this discussion • 362 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online