    Hi Pakkham - these are my thoughts on the announcement. Overall, they seem to have executed their work programme more or less as planned (which is good) and they preliminary signs seem OK. They need everything to go well to justify any upside to the current valuation.

    Galilee Energy Limited (ASX:GLL) (“Galilee”) is pleased to provide an update on the drilling operations at its 100% owned and operated Glenaras multi-lateral pilot programme (“Pilot”) located in the Galilee Basin.

    The Glenaras 17 vertical monitoring well was spudded on 2nd May 2020. This well is located outside the Pilot area, approximately 150m to the southwest of the Glenaras 15L lateral.
    This is not very far away - presumably this is just designed to monitor the water levels, how well the dewatering is working. A number of drilling difficulties were encountered in the upper section of the hole, at a level significantly above the level of the Betts Creek coals. Following persistent issues, the decision was made to re-drill rather than side- track the well. On 10th May 2020, the rig was skidded approximately 13m from the previous hole centre and Glenaras 17A was spudded at 7pm. This will have an incremental cost impact but is probably not fatal.

    Glenaras 17A was then successfully drilled through to planned total depth, intersecting the full Betts Creek coal section. All coals were encountered on prognosis with excellent development of the R3 coal seam. A total of 30m of net coal was intersected including 3m in the R3 coal seam.
    30 metres of net coal is impressive but if their development plan is to drill long horizontal wells in the R3 then 3 metres is probably as thin as they would like it. A complete set of wireline logs were run, and pressure testing was conducted on key intervals within the Betts Creek section and the Upper Hutton aquifer. Initial data from the pressure testing indicates no depletion from the main aquifer units this suggests they have not touched the aquifer with the dewatering drilling which is good but I don't know whether the dewatering would have big enough to impact the aquifer anyway pressure above the Betts Creek coals but does show depletion over several intervals within the Betts Creek section, with the most depletion over the R3 section this is probably good.

    The well has been cased as a future monitoring well/producing well and the rig was released on Sunday 17th May 2020. Importantly, the Glenaras Pilot continued to run normally throughout the drilling of this observation well. The lack of updated data is disappointing

    In conjunction with the pressure data collected from Glenaras 17A, pressure build up surveys within the Glenaras Pilot will also be conducted this week. This full dataset will then be analysed to determine the progress of the Pilot and the forward plan. This will be a significant announcement

    Managing Director Peter Lansom stated, “The team executed the drilling under some difficult conditions and did so safely which is of paramount importance, particularly given the added challenges of addressing operational and personnel management during the COVID-19 outbreak. The primary focus of the Company is to now analyse the new data available in order to better understand the Pilot progress and to formulate the next steps”.In parallel with this work, the programme to seal up the nearby fracture stimulated wells at the legacy Rodney Creek and Glenaras five spot pilots is well underway. This programme is approximately 50% complete and is targeted to be fully completed in the next 2-3 weeks. The primary objective of this work is to seal off the induced fractures within these old wells to inhibit any possible connection/crossflow between sands and coals within the Betts Creek section caused by these legacy fracture stimulation treatments.

    Following analysis of all pressure survey data and the impact from the seal up programme at the nearby pilots, the Company will update the market on the forward plan for the Pilot.
 
watchlist Created with Sketch. Add GLL (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
0.000(0.00%)
Mkt cap ! $7.814M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 82272 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 40000 1
View Market Depth
Last trade - 16.12pm 18/07/2024 (20 minute delay) ?
GLL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.