BHP 0.86% $40.55 bhp group limited

so what to do with all their cash now...., page-51

  1. 5,851 Posts.
    lightbulb Created with Sketch. 711
    I would have thought that an advancing company in which
    BHP-Billiton has held a major interest for a considerable time and has further acquired over time to take its current holding to 15.6% would at least be a 50/50 chance of a takeover by either BHP or Vale.

    It is evident that any number of possible takeovers by BHP exist but this is one that has very real possibilities and in my opinion is likely to surface anytime within the next 3 months.

    Before i am howled down/scorned and laughed at by anti laterite people on Hot Copper, just spare a thought as to why BHP are Heron's second major holder and if that doesn't give you an answer, just remember that nickel laterite is the future and the next cycle is in motion.
    Heron has always been about the next cycle!!
    Please do not form an opinion without reading this whole post.


    WHY IS HERON DIFFERENT - THREE MAJOR PROJECTS.

    .. Major Shareholders
    • Directors 19.7%
    • BHP Billiton 15.6% (have held & accum for approx 5 years)
    • Vale Inco 13.46%
    * Top 20 Holders with 64.69%

    .. Worlds largest undeveloped Nickel resource.

    .. Low sovereign risk – good infrastructure

    .. Partnership with Vale on Kalgoorlie Nickel Project.

    ..Worlds number 1 and 2 mining companies as major shareholders.

    POSITIVES IN A BRAVE NEW WORLD.

    .. Nickel Price
    • Confirms nickel’s status of most volatile of the metals.
    • Starting to see supply reduction
    • Will equilibrate to new cost of production in long term.
    • Iron credit in NPI reduced.

    .. AUSTRALIAN DOLLAR
    • A fall of around 30%

    .. The mineralisation in the KNP resources would fill
    Sydney Harbour 1.3 times
    .. It is the largest undeveloped Nickel resource single
    project in the world
    .. Resource is amenable to screening capable of 1.5% Ni leach feed.
    .. Infrastructure and inputs
    .. Resource drilling complete
    .. Resource estimation commenced.
    .. Beneficiation and metallurgical test-work well advanced.
    .. Baseline environmental studies commenced.
    .. Government liaison briefings commenced.

    The Company’s Kalgoorlie Nickel Project (KNP) partner, Vale Inco, continued work on the prefeasibility
    study into the KNP, with an approved budget to the end of November of a very significant A$22 million
    dollars. Work is progressing on the engineering, resource estimation and process design with cost
    estimation to be undertaken later in 2008. as announced in heron’s most recent quarterly report, Vale has
    confirmed it is on target to deliver the pfs report by the end of january next year-2009 which is on time. this is an
    excellent result for heron and vale and credit must go to vale to be able to achieve this during a period of
    difficult labour and service provider availability.

    ---------------------------------------------------
    YERILLA PROJECT.

    .. Comprises of Jump-up Dam, Boyce Creek and
    Aubils resources 135mt at 0.77% Ni 0.05% Co
    .. Mines 57mt of ore over 18 years
    .. Treats 45mt to produce 22,000t of Ni and Co
    mixed sulphide per annum
    .. Generates net cash flow of $180m per annum
    .. 6 year payback an capex of 1.2 billion NPV of 220m.

    During the course of the year the Company combined the nickel laterite resources of Jump-up Dam with
    Aubils and Boyce Creek to form the Yerilla Project and produced a positive Scoping Study on development
    of the project using Atmospheric Leaching technology. The Company’s significant land holding in the Yerilla
    district and the Technology and Supply Agreement the Company entered with BHP Billiton in January of this
    year made this possible. The Company’s total resource base (including the Kalgoorlie Nickel Project) now
    exceeds one billion tonnes of nickel laterite mineralisation and the Yerilla resource contributes 135.3
    million tonnes to this total creating a second major nickel project for the company.
    Buoyed by the successful Scoping Study result for the Yerilla Project, the Company has embarked upon a
    structured process to investigate the project’s optimum development. With capital expenditure exceeding
    one billion dollars, Heron believes maximum value can be obtained for the Company’s shareholders through
    the introduction of an equity partner to the project.

    ---------------------------------------------------
    LANGLEY PHOSPHATE PROJECT.

    Assays pending.

    --------------------------------------------------
    Among other stocks, i hold BHP and also Heron.
 
watchlist Created with Sketch. Add BHP (ASX) to my watchlist
(20min delay)
Last
$40.55
Change
-0.350(0.86%)
Mkt cap ! $205.7B
Open High Low Value Volume
$40.15 $40.55 $40.03 $283.0M 7.014M

Buyers (Bids)

No. Vol. Price($)
1 246 $40.54
 

Sellers (Offers)

Price($) Vol. No.
$40.55 7291 1
View Market Depth
Last trade - 16.10pm 13/11/2024 (20 minute delay) ?
BHP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.