This is from the Carbon Energy Webpage:
Table1. Energy (PJ) potentially recoverable from 12km2 section of the Surat Basin
Total Area 12km2 Total
In situ Energy (PJ) Recoverable Energy (PJ)
Mining 120 M Tonnes 2400 800
(UCG) 120 M Tonnes 2400+22.8* 1257+22.8*
CSG CH4m3 2.175x106 82.6 59.5
* CH4 contained within the coal resource.
Why can't UCG have a tenement large enough to meet the project needs, perhaps even pay the CSG the profit they would make from the 60PJ of gas.
- Forums
- ASX - By Stock
- CXY
- any thoughts guys?
any thoughts guys?, page-3
Featured News
Add CXY (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online