new community newsletter today.
http://www.alkane.com.au/wp-content/uploads/2020/06/TGO_newsletter_issue22_June.pdf
Tomingley news:
Production ramps up
Tomingley Gold Operations has continued mining and
producing gold at an excellent rate over the past few
months. The processing plant, after resuming with a
three-panel roster following the summer shutdown,
was ramped up to four crews and 24/7 production at
the beginning of May, bringing the plant back up to
full capacity.
We are processing a mix of underground ore and
low-grade stockpiles. In addition, we are currently
undertaking a short mining campaign in the Caloma One
pit, which is also contributing to the plant feed.
The underground development continues on schedule,
with several areas set up for mining. Surface resource
definition drilling is ongoing to test the planned
underground development below the Caloma Two
open pit. This is planned to be completed in the next
few months.
- Forums
- ASX - By Stock
- ALK
- newsletter
newsletter
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ALK (ASX) to my watchlist
(20min delay)
|
|||||
Last
52.5¢ |
Change
-0.020(3.67%) |
Mkt cap ! $317.6M |
Open | High | Low | Value | Volume |
54.0¢ | 55.0¢ | 52.5¢ | $518.0K | 968.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 140725 | 52.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
54.0¢ | 67758 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 74059 | 0.525 |
7 | 270095 | 0.520 |
3 | 36850 | 0.515 |
1 | 19568 | 0.510 |
1 | 30000 | 0.505 |
Price($) | Vol. | No. |
---|---|---|
0.540 | 67758 | 3 |
0.545 | 8558 | 1 |
0.550 | 56450 | 3 |
0.555 | 50659 | 2 |
0.560 | 22785 | 2 |
Last trade - 16.10pm 06/11/2024 (20 minute delay) ? |
Featured News
ALK (ASX) Chart |