The stone work in my garden took an age to figure and it is laid on inches of concrete and has underground drainage.
It had to drain properly and the first downpour was a delight to watch.
The slabs are 600 by 600 and there was quite a bit of cutting involved too and enough dust. LOL
The pond is semi circular about with bull nose edging and is another great spot to sit.
Fortunately the landscapers offsider was brilliant at math too and we all got along really well. We spent a lot of time in
calculating and managed to get it right.
The garden beds were well prepared with mulch dug in and worms and then mulch topped and they were paid and the
planting delayed. I ran out of money and could hardly afford to feed myself. LOL
That same old story - money. LOL