PEL92 drilling to start 4 x wells expected.
"The Ensign 30 rig is currently being moved to Callawonga-5 (PPL 220) after a short delay due to significant rain in the region. Callawonga-5 is the first well of a four well program including two development wells at the Callawonga Oilfield and two oil exploration wells in PEL 92. Interests in PEL 92/PPL 220 are Beach Petroleum Ltd (75.00%) and Cooper Energy Ltd (25.00%)."
- Forums
- ASX - By Stock
- AOE
- Ann: Progress Report
Featured News
Add AOE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online