FBR 9.43% 5.8¢ fbr ltd

Ann: FBR Corporate Presentation - July 2020, page-2

  1. 1,660 Posts.
    lightbulb Created with Sketch. 1002
    Key assumptions:
    Hadrian X® manufacturing cost at scale: $1 million
    Hadrian X® crew: 2 people per 12 hour shift
    Hadrian X® useful life: 12 years
    Number of 12 hour shifts per year for Hadrian X®: 252
    Hadrian X® maintenance and fuel cost per year: $175,000
    Hadrian X® laying cost excludes corporate overheads
    Standard double brick house has 351 vertical sqm of wall (237m2 internal facing and 114m2 external facing)
    Manual bricklayers work in a crew of three (two bricklayers and one labourer). Crew lays 1,000 maxibricks per eight-hour day. Equivalent to 108 standard bricks per hour per person
    Manual maxibrick laying cost, taking one to two weeks (laying only) would be $24-$48/sqm wall laid, with the range dependent upon at which point in the supply and demand cycle the
    laying occurs
    Hadrian X® average laying speeds are examples only
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
5.8¢
Change
0.005(9.43%)
Mkt cap ! $257.6M
Open High Low Value Volume
5.4¢ 6.2¢ 5.3¢ $1.840M 31.76M

Buyers (Bids)

No. Vol. Price($)
1 120000 5.8¢
 

Sellers (Offers)

Price($) Vol. No.
5.9¢ 75218 1
View Market Depth
Last trade - 16.10pm 15/07/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.