Key assumptions:
Hadrian X® manufacturing cost at scale: $1 million
Hadrian X® crew: 2 people per 12 hour shift
Hadrian X® useful life: 12 years
Number of 12 hour shifts per year for Hadrian X®: 252
Hadrian X® maintenance and fuel cost per year: $175,000
Hadrian X® laying cost excludes corporate overheads
Standard double brick house has 351 vertical sqm of wall (237m2 internal facing and 114m2 external facing)
Manual bricklayers work in a crew of three (two bricklayers and one labourer). Crew lays 1,000 maxibricks per eight-hour day. Equivalent to 108 standard bricks per hour per person
Manual maxibrick laying cost, taking one to two weeks (laying only) would be $24-$48/sqm wall laid, with the range dependent upon at which point in the supply and demand cycle the
laying occurs
Hadrian X® average laying speeds are examples only
- Forums
- ASX - By Stock
- FBR
- Ann: FBR Corporate Presentation - July 2020
Ann: FBR Corporate Presentation - July 2020, page-2
-
-
- There are more pages in this discussion • 186 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
|
|||||
Last
2.4¢ |
Change
-0.001(4.00%) |
Mkt cap ! $106.6M |
Open | High | Low | Value | Volume |
2.4¢ | 2.5¢ | 2.4¢ | $30.22K | 1.246M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 2149681 | 2.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.5¢ | 3141381 | 17 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 2149681 | 0.024 |
33 | 7250078 | 0.023 |
20 | 3061913 | 0.022 |
7 | 2802157 | 0.021 |
16 | 4293746 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.025 | 3141381 | 17 |
0.026 | 3134395 | 18 |
0.027 | 2531680 | 6 |
0.028 | 3471888 | 4 |
0.029 | 343680 | 1 |
Last trade - 15.30pm 27/06/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |