ADV 0.00% 13.8¢ ardiden ltd

Ann: Exploration Update - Pickle Lake Gold Project, page-61

  1. 163 Posts.
    lightbulb Created with Sketch. 17
    Not a bad idea.
    So the 3000 line km will be flown at 120-150’ by TerraQuest at only 50m line spacings. That hasn’t ever been done here, at least to that definition. Should take about 12hrs of flight to get the data.
    I should think this geophysical survey will be very good, and it will not be too far away. Weather permitting.
 
watchlist Created with Sketch. Add ADV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.