rowingboat
I think CTO intends to ultimately open up about 15 mine faces of which 10 are expected to produce simultaneously at Warrior (each stope may have a couple of mine faces).
So the 5 unproductive mine faces might be the ones that are between pods I guess ...when they would be working their way/looking for the next productive pod? .
When they get to the next productive pod they would in turn switch over to being a productive mine face... and the on/off, 10 on, 5 off cycle continues.
5/15 implies that 1/3rd of the time we would be between producing pods ?
so they are planning to tackle the expected inconsistency of the ore by blending from a number of productive faces (10).
I hope that what i've posted above is what was conveyed to me.
I'd appreciate if you or someone else would call the company up and re-check the above and also ask the questions relating to your concerns about the small pods and possible cost blow outs - Chris Towsey would be the best person to speak to.
- Forums
- ASX - By Stock
- CTO
- strong buying
strong buying, page-21
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
Add CTO (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
-0.001(20.0%) |
Mkt cap ! $12M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.4¢ | $4.065K | 1.013M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 312044 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 7185216 | 16 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 312044 | 0.004 |
27 | 17876936 | 0.003 |
10 | 15478691 | 0.002 |
10 | 15702988 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 6900944 | 15 |
0.006 | 4642437 | 6 |
0.007 | 2263000 | 4 |
0.008 | 3922992 | 5 |
0.009 | 2370800 | 4 |
Last trade - 14.49pm 04/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
CTO (ASX) Chart |