I'm not sure there would be time to get a job like that done. This is a Hazardous Facility, if not a Major Hazardous Facility. Onsite permits would take time. I was thinking more along the lines of some basic, half-done cleaning job.
I'm not a mechanical or chemical engineer but I would guess removing one absorber wouldn't really help. What's the difference between having two absorbers in series (where all the gas goes into the first absorber first, then into the second), and one absorber only (where all the gas goes into the one absorber)? In a series arrangement the same amount of gas is going into the first absorber regards of whether there's one or two.
- Forums
- ASX - By Stock
- AEL
- Ann: Sole Orbost Update 19 June 2020
Ann: Sole Orbost Update 19 June 2020, page-149
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $448.8M |
Open | High | Low | Value | Volume |
16.5¢ | 17.5¢ | 16.5¢ | $125.0K | 727.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 311492 | 17.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.5¢ | 160000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 311492 | 0.170 |
16 | 608680 | 0.165 |
6 | 606346 | 0.160 |
4 | 102177 | 0.155 |
5 | 406000 | 0.150 |
Price($) | Vol. | No. |
---|---|---|
0.175 | 160000 | 2 |
0.180 | 558927 | 8 |
0.185 | 310171 | 5 |
0.190 | 268083 | 7 |
0.200 | 299395 | 6 |
Last trade - 15.59pm 12/11/2024 (20 minute delay) ? |
Featured News
AEL (ASX) Chart |
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online