Hi CEO
Too technical a topic. Simple answer is it can b a tricky operation for a vertical/ lateral remediation workover. At U1 they had Baker for the ESP workover, not sure if they r doing it at U7 (or SLB r there). Showstoppers range from Mechanical issues with the tubing hanger, pump, electr cables, chemical injection, sliding sleeve etc. I dont know U7's profile so cant really comment (but thats what they had at U1).
Offshore rates r higher so they try to keep things fast with minimal downtime et al. Onshore can b a different pace.
U can read about ESP's from BH's website, see link.
https://www.bhge.com/upstream/production-optimization/artificial-lift/electrical-submersible-pumping-systems/pumps/flexpump-series
- Forums
- ASX - By Stock
- KAR
- July flowrate
July flowrate, page-8
-
- There are more pages in this discussion • 51 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
|
|||||
Last
$1.74 |
Change
-0.055(3.06%) |
Mkt cap ! $1.394B |
Open | High | Low | Value | Volume |
$1.88 | $1.90 | $1.74 | $19.55M | 10.90M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 52784 | $1.74 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.75 | 5000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 52784 | 1.740 |
2 | 3451 | 1.735 |
5 | 120629 | 1.730 |
2 | 46094 | 1.725 |
4 | 51294 | 1.720 |
Price($) | Vol. | No. |
---|---|---|
1.745 | 5000 | 1 |
1.750 | 40759 | 3 |
1.755 | 5782 | 1 |
1.760 | 5782 | 1 |
1.765 | 92051 | 3 |
Last trade - 16.10pm 25/07/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |