EWC 9.09% 1.2¢ energy world corporation ltd

Philippine ROW issue, page-11

  1. 606 Posts.
    lightbulb Created with Sketch. 17

    Further tomy earlier post, the 19 Aug 2020 DoE report, also provides target operationdates, capacity as well as total construction costs for each of the 4 lngprojects. From this data (table 24 below) it is clear that the project costsfor the FGEN and EWC projects are well below the other 2 projects, with Exeleratecosting twice as much and Batangas 5 times as much (on a per mtpa basis).

    Table 24. POTENTIAL INVESTMENT IN THE DEVELOPMENT OF LNG TERMINAL

    Project

    Target Operation

    Location

    Capacity

    Total Construction Cost

    (in Million PhP)

    FGEN LNG Corporation

    Floating Storage & Regasification Unit (FSRU) Terminal

    2022

    Barangays Sta. Clara, Sta. Rita Aplaya, and Bolbok in Batangas City

    5.26 MTPA

    13,284

    Excelerate Energy L.P.

    Floating Storage Regasification Unit (FSRU) Terminal

    2022

    About 9.5 km offshore in Bay of Batangas

    1.5 MTPA

    6,387

    Energy World Gas Operations

    Philippines Inc

    LNG Storage and Regasification Terminal

    2022

    Barangay Ibabang Polo, Pagbilao Grande Island, Quezon Province

    3 MTPA

    7,408

    Batangas Clean Energy, Inc

    LNG Storage and Regasification Terminal

    2025

    Barangay Pinamucan-Ibaba, Batangas City

    3 MTPA

    37,553











    It is also pleasing to note that Energy Secretary AlfonsoCusi is now closely monitoring theses projects’ progress so that the proposedcommissioning targets can be met.

 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.001(9.09%)
Mkt cap ! $36.94M
Open High Low Value Volume
1.2¢ 1.2¢ 1.2¢ $2.567K 213.9K

Buyers (Bids)

No. Vol. Price($)
1 549999 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.4¢ 300000 1
View Market Depth
Last trade - 13.39pm 10/07/2024 (20 minute delay) ?
EWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.