Ann: Cooper Basin Project Update , page-13

  1. 286 Posts.
    Opaline,
    I think you are right, there are a number of obstacles to deal with,
    5" drill pipe,
    Bottom hole assembly consisting of 6 1/2" drill collars and then a couple of 8 1/2" stabilisers, maybe a motor and then the drill bit. The larger diameter stabiliser and bit can't be washed over.
    I guess the course of action is washover the drill pipe and possibly the drill collars to recover as much as possible, this is faster than drilling a new side track hole, then try and yank the remainder but it is probably stack fast with angular chips of granite wedging it, so after a few attempts set a wedge and drill a new hole.
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(20.0%)
Mkt cap ! $2.904M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $16 3.947K

Buyers (Bids)

No. Vol. Price($)
32 20401329 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 492104 2
View Market Depth
Last trade - 15.41pm 16/07/2024 (20 minute delay) ?
RNE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.