• 5,000 metres of combined reverse circulation (RC) and diamond
drilling planned
• RC drilling scheduled to commence mid-late October with
diamond drilling set to commence from November 2020
• Drilling will target 600m of highly prospective strike along the
Burbanks Shear between Main Lode and Burbanks North
deposits below encouraging RC results from 2019, including:
o BBRC303 – 8m @ 4.10g/t Au from 159m down-hole
o BBRC292 – 3m @ 5.38g/t Au from 185m down-hole, and
o BBRC294 – 4m @ 2.58g/t Au from 168m down-hole
• Previous drilling tested to 100 metres below surface, the
forthcoming program will target between 130 and 350 metres
below surface
• The program is estimated to take 4 to 6 weeks, with first results
to be announced approx. 2 weeks from program completion
- Forums
- ASX - By Stock
- GSR
- Ann: Drilling to Re-commence at Burbanks
Ann: Drilling to Re-commence at Burbanks, page-2
-
- There are more pages in this discussion • 66 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GSR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, Chief Executive Officer
Paul Long
Chief Executive Officer
SPONSORED BY The Market Online