ADV 0.00% 13.5¢ ardiden ltd

Banter and General Pickle Lake Area Comments

  1. 17,079 Posts.
    lightbulb Created with Sketch. 3840
    South limb prospect news.  Only a 2500 meter follow up at Dona Lake by MCR  however it is south of the mine. Must be very close to border tenements.

    Metals Creek Resources Signs Drilling Contract For Minimum 2500 Meters Drilling At Dona Lake Gold Project.

    https://www.juniorminingnetwork.com...eters-drilling-at-dona-lake-gold-project.html

    MCR is pleased to announce that the Corporation has engaged M3 Drilling to conduct a minimum 2500 meter drill program on the Dona Lake Gold Project. This drill program is expected to commence during the latter part of October once the drill becomes available. An announcement will be made once drilling has commenced.

    This upcoming program will be designed to further test for gold mineralization immediately south of the Dona Lake mine including both the Main and B-Zone mineralized horizons. Deeper drilling will also take place further evaluating the continuation of gold mineralization below the lowermost level (455L) of the Dona Lake mine. A part of this deeper drilling will be to test for gold mineralization below hole DL20-03 (See MEK news release September 15, 2020) which intercepted mineralization at 500m vertically below surface.
 
watchlist Created with Sketch. Add ADV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.