Found the info about the long lead time items from the drilling update on the 26th of August.
“All five wells will be drilled vertically to just below the R7 coal, resulting in a total depth of approximately 1050m. All necessary long lead items have been ordered with several items already in storage at site. Drilling is expected to take 5 to 6 weeks.”
ps sorry about the last post, have had a few beers after a 12hr day
- Forums
- ASX - By Stock
- GLL
- Ann: Glenaras Drilling Update
Ann: Glenaras Drilling Update, page-6
Featured News
Add GLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.243M |
Open | High | Low | Value | Volume |
1.4¢ | 1.4¢ | 1.3¢ | $810 | 60.14K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 614045 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 1372140 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 614045 | 0.013 |
2 | 999702 | 0.012 |
7 | 2666909 | 0.011 |
3 | 1500000 | 0.010 |
1 | 300001 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 1372140 | 2 |
0.015 | 1293333 | 2 |
0.019 | 1010789 | 1 |
0.024 | 1338800 | 2 |
0.025 | 192000 | 2 |
Last trade - 13.05pm 04/10/2024 (20 minute delay) ? |
Featured News
GLL (ASX) Chart |