Hey BullMarket.
If your crazy, that makes me a nut job! I have been in DNK since 2007 and still waiting for ROI. It has really been disgraceful how management have kept kicking the can down the road. From discovery stage then PFS, DFS, FEED, OFFTAKE and now finance and yet construction still hasn't commenced. Misleading us shareholders with these optimistic time charts which I am now seeing on E25 posts. Each of these stages of the process have taken a year or two! I am still a foolish believer though. Too good an asset to just sit in the ground. At least you have done well from E25. Congratulations. I was seriously considering dumping a few DNKs and buying E25 between 35c to 40c but thought too long about it. Hopefully, things will take off here too. Cheers.
- Forums
- ASX - By Stock
- DNK
- Ann: Appointment of Preferred Power Contractor
Ann: Appointment of Preferred Power Contractor, page-8
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DNK (ASX) to my watchlist
(20min delay)
|
|||||
Last
31.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $151.0M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
DNK (ASX) Chart |
Day chart unavailable