I'd be very dissapointed if they upgraded facilities to 2000 bopd. On the basis that it was not achievable.I believe the upgrade is based on deliverability of the rates.
TMG Trigg brings famed Finnish metals refiner – and its tech – onboard to bolster antimony processing