Team- some notes. and answers to a bunch of questions. Apologies just typing as i was going.
Build a JV company with Ecorpro- JV will be established post PFS as PFS is when project signficantly de-risked
Our Nickel sulfate cost $3.50/lbs concentrate Vs current nickel price $7/lbs- so even though we are developing into a precursor, the concentrate Vs concentrate vs our peers $3.50/lbs for concentrate for comparative purposes- very competitive vs our peers. But we refine and process into a premium product NCM which sells at a premium but also then has a higher cost as we have to add cobalt and manganese reagents.Higher input cost but then we trade at a much better premium/payability.
$8/lb nickel price in line with most peers as per slideshow - range $6.90-$9.35/lbs
Scott will get the existing capex turning early- reduce capex costs, get cashflow sooner, and use to partly fund capex
Shared capex for 150ml downstream facility- likely 75ml/75ml with ecopro
If they continue to hit massive targets might make sense to delay PFS slightly- this would be driven by discoveries that massively positively change the economics of the project
Have been delays in the labs- assays in perth, logistics issues etc, market wide
Ban Phuc disseminated- believe just the start of what will be a world class nickel sulphide district. 2 rigs ban phuc, 4 other rigs on site and more arriving.
2 x Geophysics crews working every day of the week looking for more sulphide bodies to test.
Using most powerful EM transmitter on market being used to find massive sulphides- 20km of strike. Next 18 months major geophysical program planned. 500m of strike extent a week. 20km of strike = over a year to test. second piece of gear to speed it up. over next 6-12 months good portion of that will be drilled. So much upside.
Unlock district very cheaply.
- Forums
- ASX - By Stock
- BSX
- Ann: Blackstone Minerals Investor Presentation - Scoping Study
Ann: Blackstone Minerals Investor Presentation - Scoping Study, page-9
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add BSX (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
-0.005(14.7%) |
Mkt cap ! $15.31M |
Open | High | Low | Value | Volume |
3.3¢ | 3.3¢ | 2.9¢ | $13.70K | 434.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4999 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 623537 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 4999 | 0.029 |
4 | 248000 | 0.028 |
1 | 370000 | 0.027 |
2 | 575000 | 0.026 |
3 | 57800 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 623537 | 2 |
0.035 | 2500 | 1 |
0.036 | 100000 | 1 |
0.037 | 20000 | 1 |
0.038 | 62362 | 1 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
BSX (ASX) Chart |