Previous results suggest a reversal of fortunes for the two Bakers.
However, Baker 1 was never completed and the results reflect flow from a damaged well (there is no mention that the blockage has been cured or circumvented).
Baker 2 is a massive result. It was originally reported as being 1,500 ft. That makes the production rate 54 boepd / 100 ft. That is twice the rate achieved by Kunde 3 and very nearly twice the rate achieved from the bottom 1,500 section of Kowalik first reported.
If (BIG IF) that kind of flow can be replicated for Block B wells in sections drilled through natural fractures, we would see significant flows from Kowalik and Weston (which seemed to be flaring as they drilled a bit like Baker 2).
- Forums
- ASX - By Stock
- DXI
- block a-3 and a-4 wells placed on production t
DXI
dexus industria reit.
Add to My Watchlist
0.73%
!
$2.76

block a-3 and a-4 wells placed on production t, page-2
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
$2.76 |
Change
0.020(0.73%) |
Mkt cap ! $875.6M |
Open | High | Low | Value | Volume |
$2.76 | $2.77 | $2.73 | $1.778M | 645.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3600 | $2.73 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.76 | 4235 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3600 | 2.730 |
1 | 1000 | 2.720 |
3 | 9483 | 2.710 |
10 | 46612 | 2.700 |
4 | 7902 | 2.690 |
Price($) | Vol. | No. |
---|---|---|
2.760 | 4235 | 1 |
2.780 | 3154 | 1 |
2.800 | 8406 | 2 |
2.810 | 1000 | 1 |
2.820 | 1000 | 1 |
Last trade - 16.13pm 22/07/2025 (20 minute delay) ? |
Featured News
DXI (ASX) Chart |