CUE 0.00% 10.0¢ cue energy resources limited

Ann: Ironbark-1 Rig Mobilisation, page-103

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Those are the actual co-ords I posted, which is apprx 38m from the wellhead. The rig's DGPS sits away from the Derrick & they don't release the full downhole Well Survey data until after a couple of years.

    36" Conductor done. Surface casing next (ie 22" joints) & then set the BOP & Riser etc etc to collect cuttings. Safe drilling.
 
watchlist Created with Sketch. Add CUE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.