They need to get off-section and start drilling along strike and more perpendicular to the VC conductors, I'm in the green here, but not putting anymore in until I see a drill hole planned along strike to the WNW or ESE and more perpendicular to the VC7 conductor. Early days yet and needs more drilling but could be some surprises in the drilling, and consequent surprises still in store for the geological interpretation (both upside and downside surprises).
I'm assuming they are maybe constrained by topography and pre-existing native title clearance surveys about where they can and cant set up the rig?