    Quarterly Report 29 October

    High Priority AC Drilling Program
    A high priority ~2,000m AC drilling program has commenced with the aim to infill the spacing around
    KAC0091 to 100m centres in order to obtain an increased understanding of dispersion patterns and assist
    vector towards a potential sulphide source. A fence of AC holes will also be completed over the surface
    projection of the interpreted MLTEM conductor. The results of the AC drill program are expected in
    December 2020.


    Phase 2 MLTEM Survey
    A second phase MLTEM survey has been designed over geophysical Targets 6, 8 and 10 (Figure 2). The
    MLTEM survey will be on a line spacing of 175-200m, station spacing of 100m with loop square layout of
    300m. The Phase 2 MLTEM survey is expected to start in the December quarter, subject to crew availability.
    The MLTEM survey results will assist in the final design and location of the Exploration Incentive Scheme
    drill holes that are planned to be completed in HY1 2021.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
12.0¢
Change
0.000(0.00%)
Mkt cap ! $8.647M
Open High Low Value Volume
12.0¢ 12.0¢ 12.0¢ $11.13K 92.78K

Buyers (Bids)

No. Vol. Price($)
1 7219 12.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.5¢ 30000 1
View Market Depth
Last trade - 10.37am 07/08/2025 (20 minute delay) ?
CR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.