Hi @stagg11
I seriously doubt that St George will release a JORC on its own as the shallow resource at Stricklands will be too small. They need to show how much money it makes as that will be the key driver.
All I know is that their Canadian research partner is still doing the metallurgical work and that once those results are known St George will then need to analyse and do the mining feasibility on it all to validate the expected profitability of the initial shallow Stricklands mining operation. This analysis would most likely take another 4 to 6 weeks with the holiday period upon us.
As such with just over 2 weeks until the Christmas shutdown I think the probability of a full feasibility announcement is very low and if there is an announcement it will probably be an update on progress.
Cheers SandyC
- Forums
- ASX - By Stock
- SGQ
- Ann: Multiple New EM Conductors at Mt Alexander
Ann: Multiple New EM Conductors at Mt Alexander, page-49
-
- There are more pages in this discussion • 278 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $31.56M |
Open | High | Low | Value | Volume |
2.9¢ | 2.9¢ | 2.9¢ | $26.86K | 926.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 685327 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 582257 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 685327 | 0.029 |
6 | 762297 | 0.028 |
5 | 1960740 | 0.027 |
10 | 15906036 | 0.026 |
9 | 14861430 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 582257 | 5 |
0.031 | 809827 | 4 |
0.032 | 411780 | 3 |
0.033 | 687656 | 6 |
0.034 | 149428 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
SGQ (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online