STTCOMP XAM FA LONG
1,091,841,522 SOI
36m MC @ 3.6c,
11.6m COH.
25m EV
emerging Tier 1 MRE: 1.9 million tonnes of copper and 4.3 million ounces of gold
Same region as Rio's Oyu Tolgoi mine
Aug 2020 - completed 12m cap raise at 4.5c
Expectant news
-Phase 1 Kharmagtai drilling program: 6000m left to drill (4 drills running) from a 23,000 metre plan
- 9800m of assays pending.
-Increased news flowfrom Phase 1 drilling results expected through Q1 CY21 to support a plannedResource Update
-Exploration TargetReview and Mining Concepts Study (Q1 CY21)
-An updated MineralResource Estimate is planned in H1 CY2021.
-Drilling ProgramPhase 2 Results (Q1 to Q3 CY21)
-An updated “MiningOptions Study” is also planned.
-Updated ConceptStudy and Gating Decision (Q4 CY21 to Q1 CY22)
- Forums
- ASX - Short Term Trading
- Short Term Trading Week Starting: 07 Dec
Short Term Trading Week Starting: 07 Dec, page-135
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online