OAR 0.00% 0.2¢ oar resources limited

Ann: Exploration Update on Gibraltar and Nevada, page-5

  1. 25,625 Posts.
    lightbulb Created with Sketch. 1213
    HIGHLIGHTS:
    Gibraltar Halloysite-Kaolin Project, South Australia
     All samples have now been collected and submitted for detailed test work in South
    Australia; processing of samples is progressing well, with results anticipated in January
    2021.
     Submission of new work approvals for drill testing of northern extensions, along with wide
    spaced regional drill traverses are to be submitted in December 2020; with infill and
    extensional drilling proposed for the first quarter 2021.
    Lambarson Canyon, Nevada
     All gold assay results from diamond drilling have been received; base metal and spectral
    analysis results anticipated in January 2021.
     Anomalous gold results in LCD-02 associated with altered pyritic and quartz-veined
    porphyry lithologies.
     Compilation and interpretation of base metal data, litho-geochemical interpretation,
    detailed alteration and mineral system mapping and reprocessing the existing IP data to
    be undertaken in January 2021
     Next on-ground exploration to include additional geophysical data capture, systematic
    surface geochemical sampling and analysis, detailed fact mapping, prior to the planning of
    the next phase of drill testing.
    Douglas Canyon, Nevada
     A total of 560m are planned to test outcropping high-grade gold/silver quartz veins
     Additional work may include detailed mapping, geophysical surveys, surface geochemical
    sampling
 
watchlist Created with Sketch. Add OAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.