Theoretically yes, economically, no - Vulcan's advantage is that they bolt on DLE process to existing geothermal plants by forming JV with the plant operator. Thus, our lithium resource (heated brine) and JV already contain all of the required conditions to export net energy back to grid as Pabs and aussie mentioned.
For another miner (e.g. spod producer), the cost of building a massive green energy farm would likely make the overall project infeasible and would struggle to get backing, Thus, this presents a strong moat assuming other risk factors which have already been brought up several times are successfully negotiated. PFS ann to shed light on these.
Add to this the geographic moat, in that if we get into production we will be the closest lithium producer to every German battery factory, greatly reducing emissions.
- Forums
- ASX - By Stock
- VUL
- VUL megathread
VUL megathread, page-1157
-
- There are more pages in this discussion • 6,632 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VUL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.74 |
Change
-0.150(3.07%) |
Mkt cap ! $892.0M |
Open | High | Low | Value | Volume |
$4.81 | $4.96 | $4.74 | $2.666M | 550.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 681 | $4.74 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.78 | 5000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 17760 | 4.700 |
1 | 500 | 4.690 |
1 | 15000 | 4.680 |
1 | 5000 | 4.660 |
1 | 108 | 4.650 |
Price($) | Vol. | No. |
---|---|---|
4.780 | 5000 | 1 |
4.800 | 3683 | 1 |
4.820 | 6000 | 1 |
4.850 | 3200 | 1 |
4.880 | 10000 | 1 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
VUL (ASX) Chart |