Good to see some action ....
Drilling to Re‐Commence at Southern Cross Gold Project
Highlights:
Drilling to re‐commence at the Southern Cross Gold Project, located in an area of Western Australia recognised as a prolific gold mining region, with existing processing infrastructure and +15Moz gold produced to date.
5 reverse circulation holes for 1,350m to be drilled targeting known mineralised zones at Boodarding.
Preliminary 4 metre composite assay results from Axehead, Xantippe and Battler North from December 2020 drilling due imminently.
GLTAHs 2021
- Forums
- ASX - By Stock
- XTC
- Ann: Drilling to Re-Commence at Southern Cross Gold Project
Ann: Drilling to Re-Commence at Southern Cross Gold Project, page-2
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add XTC (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $87.6K |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
XTC (ASX) Chart |
Day chart unavailable