I think things will start to happen after 2021, once they get the washing plant up and running early this year, TIG plan to
TIG Plans for 2020 & beyond:▪ Continuing exploration to convert JORC resources to reserves▪ Further in-mine exploration drilling to improve quality control, short-term mine planning and strip ratios▪ Start mining on Zvonkoye deposit▪ Preparing for launch of drill and blast operations which willallow for bigger pit design▪ Completing CHPP design works, financing and construction▪ Expecting first washed coal in 2021▪ Developing existing customer relationships and expand customer base▪ Increasing transshipment capacity & load rates through use of own barges and taking over port operations, increasing overall throughput capacity and improving netbacks▪ Planning to ship 1+ Mtpa of the washed product starting 2022
▪ TIG has progressed from an exploration company to a producer of coal exporting and competing on the global seaborne market▪ Within just three years the company has grown coal production from zero to 720kt targeted for 2019▪ Our product has gained a good level of acceptance in key Asian markets▪ TIG expects that coal handling and preparation plant design and engineering works will be completed in H1 2020▪ The current mining equipment and haulage fleet are capable of producing up to 750ktpa▪ TIG is operating its own infrastructure with coal haulage all-season pit to port road▪ The Company added four 500t barges to port equipment to increase offshore loading rates
Key Operational Results 2017 – 2018 and 2019E ▪▪▪The Amaam North Resource base has a thermal coal cap of oxidized coking coalCurrently mining coal without processing – about 70% thermal & 30% coking in 2019Post CHPP startup, we expect the ratio ROM coking to thermal will move to circa 70% coking, increasing to over 75%Coal production (kt) Stripping (kbcm) Coal sold, total (kt)- Thermal (kt) - Coking (kt)226 577 7202017 20182019Е
TIG will need to have a Port that’s needs to be an all season Port for them to ship 5-10Mtpa in the future, I think they have access to another port but I can’t remember at the moment
- Forums
- ASX - By Stock
- TIG
- Tigers Realm Coal (ASX:TIG) completes retail entitlement offer
Tigers Realm Coal (ASX:TIG) completes retail entitlement offer, page-7
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TIG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $39.20M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1004636 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 2843079 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 1004636 | 0.003 |
8 | 12812500 | 0.002 |
6 | 14500000 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 2843079 | 6 |
0.005 | 2107046 | 4 |
0.006 | 750000 | 3 |
0.007 | 260000 | 1 |
0.008 | 1084221 | 2 |
Last trade - 16.12pm 04/11/2024 (20 minute delay) ? |
Featured News
TIG (ASX) Chart |
Day chart unavailable