Do a little research will you before you post rubbish like this "Biden just destroyed the oil industry" rubbish.
TransCanada Keystone Pipeline GP Ltd,[14]abbreviated here as Keystone, operates four phases of the project. In 2013, the first two phases had the capacity to deliver up to 590,000 barrels (94,000 m3) per day of oil into the Midwest refineries.[15]Phase III has capacity to deliver up to 700,000 barrels (110,000 m3) per day to the Texas refineries.[16]By comparison, production of petroleum in the United Statesaveraged 9.4 million barrels (1.5 million cubic meters) per day in first-half 2015, with gross exports of 500,000 barrels (79,000 m3) per day through July 2015.[17]