The only thing I found confusing was that Scott mentioned there is a resource of 270kt nickel and we've now moved on to drilling the 25 massive sulphide veins out. The confusion is I thought the disseminated orebody was still open at depth and along strike and was being expanded with step out drilling since the maiden resource was published as 229kt + 50kt for 279kt. It might have been a slip up or perhaps I misunderstood him
- Forums
- ASX - By Stock
- BSX
- Ann: Blackstone Signs Trafigura to Supply Downstream Processing
Ann: Blackstone Signs Trafigura to Supply Downstream Processing, page-67
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BSX (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
-0.002(6.63%) |
Mkt cap ! $18.04M |
Open | High | Low | Value | Volume |
3.1¢ | 3.1¢ | 3.1¢ | $9.3K | 300K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 0.027 |
3 | 127000 | 0.025 |
1 | 25680 | 0.023 |
1 | 100000 | 0.022 |
1 | 47619 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.029 | 50000 | 1 |
0.030 | 81800 | 1 |
0.031 | 56013 | 1 |
0.033 | 209309 | 1 |
0.034 | 40000 | 1 |
Last trade - 10.03am 06/11/2024 (20 minute delay) ? |
Featured News
BSX (ASX) Chart |