TSV 0.00% 0.8¢ transerv energy limited

fracturing, page-64

  1. 5,170 Posts.
    lightbulb Created with Sketch. 1170
    Aminer, that is not the case. They frac all the chosen zones, isolate them, then when all the fraccing is done , they drill out out all the isolating plugs and open all frac zones at the same time and flow the well. They have not reached this point yet but must be close. When they say that all fracs were a success they mean that from a mechanical point of view they fractured the wellbore in all the right places in readiness for the well to flow.
    When they open up the well it will take a week or two before a stable flow rate can be measured.
    In the meantime we keep sweating,....but no need to really because this well will flow gas bigtime.
    Occam
 
watchlist Created with Sketch. Add TSV (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.