Stage 1 - is to refurbish turbine hall 2 with the indicative installed power requirements of the base case process plant = 28 MW3 . 2 duty and 1 standby unit ▪ Stage 2 - is to refurbish turbine hall 1 with the additional indicative installed power requirements of process plant Stage 2 4 = 12.3 MW3 . 2 duty and 1 standby unit. ▪ Stage 1 and 2 combined will provide 40.3 MW guaranteed power output ▪ New HV power line and pylons to site ▪ 3 x ESIAs Approved ▪ RFTs for refurbishment in the market ▪ Studying to convert electrical excess renewable power to other uses, e.g., hydrogen for Fuel Cell Electric Vehicles (FCEV) use
- Forums
- ASX - By Stock
- AVZ
- Ann: Investor Presentation
Ann: Investor Presentation, page-2
-
- There are more pages in this discussion • 260 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Chairman
Nick Poll
Executive Chairman
Previous Video
Next Video
SPONSORED BY The Market Online