EGR 9.09% 10.0¢ ecograf limited

Graphite Recycling Pilot Plant, page-39

  1. 7,953 Posts.
    lightbulb Created with Sketch. 1648
    Hi Names, I found the below recycling process flow diagram (for another recycling company not Neometals) and it indicates that the carbon anode is sieved out before the acid leaching. I wonder if Neometals have optimised their process and now remove the carbon anode prior to the acid leaching step. There is a significant amount of carbon anode material contained in the black mass so presumably there would be some savings on the acid leaching solution if the carbon was removed prior to leaching.

    Just my thoughts.
 
watchlist Created with Sketch. Add EGR (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
-0.010(9.09%)
Mkt cap ! $45.40M
Open High Low Value Volume
10.5¢ 10.5¢ 10.0¢ $33.25K 320K

Buyers (Bids)

No. Vol. Price($)
8 405001 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
11.0¢ 70253 5
View Market Depth
Last trade - 15.53pm 02/08/2024 (20 minute delay) ?
EGR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.