Afternoon trading February 4, page-396

  1. 2,679 Posts.
    lightbulb Created with Sketch. 44
    RFR, from their quarterly:

    Detailed pre-feasibility study (PFS) of the Santa Comba Tungsten and Tin Project, with 5-year open pit mine life
    at 1.3mtpa demonstrating pre-tax NPV8 real of A$40.3M and an IRR of 156%. Drilling planned in early 2021 to
    expand resource and extend mine life.

    Not bad for 9m MC, drilling is underway, record tin prices and tungsten!
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.