BPH 4.00% 1.2¢ bph energy ltd

The Risks, page-67

  1. 6,207 Posts.
    lightbulb Created with Sketch. 309
    To elaborate on the word "variation". As far as I can tell, if the first application gets rejected and the second application gets accepted then they are still required to do a drill and a 3D seismic survey. This is a fact. This is because the second application is not "varying" the permit to exclude a 3D seismic scan.
 
watchlist Created with Sketch. Add BPH (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
-0.001(4.00%)
Mkt cap ! $14.60M
Open High Low Value Volume
1.2¢ 1.3¢ 1.2¢ $6.688K 550.1K

Buyers (Bids)

No. Vol. Price($)
20 6489956 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 1046596 6
View Market Depth
Last trade - 15.29pm 15/11/2024 (20 minute delay) ?
BPH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.