KAR 1.64% $1.55 karoon energy ltd

quarterly report out, page-9

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Hi PP

    I'll stick with the P50 estmate of 7 tcf for the time being. This is all in-ground & only 70-75% will is recoverable at any given time.

    Imagine a water soaked sponge/loofah, thats exactly what its all like, in simple terms (except we dont need water in those Plover sands, we want gas & 191m+ of it!!)

    There are 3 things to look fwd from the WL logs, the porosity, gas:water ratio & the net:gross sand thickness.

    The last one is an absolute necessity, a thick clean porous sand with minimal water gives u a great flow.

    Until now they've used data from nearby wells which are far off from the current location. So its essential that they use their own data & revise the estimates in time.

    Kontiki-1, is targetting a similar sort of strucuture, albiet more thicker then P#1, so there will b nervous moments about water/gas saturated reservoir during drilling. Fingers & legs crossed & lets hope its all gas on KT #1, as well.

    On P#1, I'd see them take a bit of time with the logging & decide what to do with the DST's, one test or more.

    If they test the thin sands first, the rates could b low compared to the thicker sand at the bottom & they wouldn't want to damage the well.

    Comes down to safe practices from here on till rig move.

    cheers
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.