Highlights:-- Logs have been acquired to 12,956’.
- The data is currently being processed and will be evaluated by RPS Energy.
- Full petrophysical evaluation of all shows is expected tomorrow.
- The logging tools are expected out of the hole around midday EST after which the MDT pressure tool will be run as the final log.
- Drilling is expected to resume this week on completion of logging and setting 7”
casing.- First target expected when drilling recommences is the Lower Barker Creek Formation, which is expected within 300’. Deeper targets include the Alkali Gulch, Pinkerton Trail and Leadville Limestone.
Cheers, Pie :)
- Forums
- ASX - By Stock
- GDN
- paradox basin no 2 update ...
paradox basin no 2 update ..., page-2
-
- There are more pages in this discussion • 60 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)